Abstract The wells in the field under study exhibit high deferred production due to recurrent failures in their Electric Submersible Pump (ESP) systems, whose replacement using workover rigs involves high operational costs and extended intervention times. The objective of this study is to evaluate the technical and economic feasibility of a new technology that enables ESP replacement without the use of a workover rig, aiming to reduce downtime, operational costs, CO2 emissions, and Health, Safet